drawrelay

MEP CAD · ALL MANAGED ONLINE

MEP shop drawing production from contractor design information

Develop installation drawing sheets from your approved design information and mark-ups. Define the required detail and coordination responsibility in the scope.

Upload a drawing and request an estimate ↗

Specify the output

List required plans, sections, details, legends and schedules. Explain installation zones, access requirements and any fabrication information that must be carried through.

References must be controlled

Architectural backgrounds and other-trade references can change during production. Project revision warnings identify affected tasks so the owner can assess their impact.

How the drawing moves forward

  1. Upload the matching CAD, marked-up PDF and project references.
  2. Review the estimate and accept the confirmed scope.
  3. Track drafting and respond to logged queries online.
  4. Review the checked proof, approve it and pay before final release.

Questions before you upload

Are these fabrication or coordinated design drawings?

Only if that purpose and the necessary design inputs are included in the agreed scope. A CAD issue alone does not establish fabrication accuracy or coordinated design approval.

Related guidance

How drawings and access are controlled · Prepare a clearer drawing handover · Plan your CAD capacity