drawrelay

MEP CAD · ALL MANAGED ONLINE

Electrical CAD drawings for contractor mark-ups

Convert your electrical layout mark-ups into a controlled CAD revision. Electrical tasks are routed to the electrical reviewer, keeping discipline responsibility clear.

Upload a drawing and request an estimate ↗

Include the drawing conventions

Supply symbol legends, circuit and equipment references, containment notes and relevant backgrounds. Describe whether a change is a layout revision, schedule update or drawing-wide replacement.

Separate tasks make checking clearer

Submit electrical and mechanical drawings separately. Queries, review findings and issue history remain attached to the relevant drawing.

How the drawing moves forward

  1. Upload the matching CAD, marked-up PDF and project references.
  2. Review the estimate and accept the confirmed scope.
  3. Track drafting and respond to logged queries online.
  4. Review the checked proof, approve it and pay before final release.

Questions before you upload

Can you infer missing circuit or protection information?

Missing design decisions are raised as queries. They are not invented during drafting.

Related guidance

How drawings and access are controlled · Prepare a clearer drawing handover · Plan your CAD capacity