Drawrelay CAD

01 / 06 HOW DRAWRELAY WORKS

It starts on site.

A route changes. A detail needs updating. Scan the full marked-up sheet into a clear PDF, keeping every note, dimension and drawing reference.

YOUR PHONE. YOUR MARK-UP. YOUR NEXT REVISION.

Scroll to follow the drawing
M-201 / P02SITE MARK-UP
REVISE DUCT ROUTELEVEL 02 · VENTILATIONDEMONSTRATION DRAWING · M-201 · P02

One change. Every detail captured.

Document scan
REVISE DUCT ROUTELEVEL 02 · VENTILATIONDEMONSTRATION DRAWING · M-201 · P02
Ready for your next revision

02 / 06 HOW DRAWRELAY WORKS

Your drawing. The whole picture.

Add your source DWG or DXF and the matching PDF mark-up to your project. Include the referenced drawings and standards your CAD team needs.

SOURCE CAD + PDF MARK-UP + PROJECT REFERENCES

drawrelay / example workspace
RIVERSIDE FIT-OUT Drawing pack

Level 02 ventilation P02

Everything your drawing needs.Matching source CAD and PDF mark-up
M-201-P02.dwgSource drawing
M-201-P02-markup.pdfYour instructions

Project references and drawing standards stay linked.

03 / 06 HOW DRAWRELAY WORKS

A clear scope. An agreed price.

Review a provisional allowance for the work. We check the scope and confirm your quote. Drafting starts once you accept it.

REVIEW THE SCOPE BEFORE WORK BEGINS

drawrelay / example workspace
RIVERSIDE FIT-OUT Scope review

Level 02 ventilation P02

ILLUSTRATIVE ALLOWANCE4–6 CAD hours

Final price confirmed after scope review.

Source drawing and mark-up attached
Scope reviewed before quote acceptance

An example only. Your quote depends on your drawing pack.

04 / 06 HOW DRAWRELAY WORKS

Less chasing. More progress.

Your CAD team works from the mark-up and project standards. Follow progress and answer drawing queries in the same workspace, with each answer kept against the job.

ONE DRAWING. ONE CONVERSATION. A CLEAR RECORD.

drawrelay / example workspace
RIVERSIDE FIT-OUT In production

Level 02 ventilation P02

Drawing pack with your CAD team
CAD TEAM · DRAWING QUERYConfirm the duct offset at grid C.

The marked route passes below the existing beam. Keep the shown offset?

YOUR REPLY

Confirmed. Maintain the marked route.

Every clarification stays with this drawing.

05 / 06 HOW DRAWRELAY WORKS

Checked. Then over to you.

A discipline engineer checks the drawing before your proof is ready. Compare it with your mark-up, ask for a revision or approve it for payment.

ENGINEER CHECK → YOUR REVIEW → YOUR APPROVAL

drawrelay / example workspace
RIVERSIDE FIT-OUT Client review

Level 02 ventilation P03

YOUR MARK-UPREVISE DUCT ROUTELEVEL 02 · VENTILATIONDEMONSTRATION DRAWING · M-201 · P02
YOUR PROOFLEVEL 02 · VENTILATIONDEMONSTRATION DRAWING · M-201 · P03DRAWING PROOF
Engineer check complete
Request a revision Review & approve

You review the proof before paying. Final files stay locked.

06 / 06 HOW DRAWRELAY WORKS

Approved. Paid. Back to site.

Once payment is confirmed, your final DWG and PDF are released to your workspace. Download the pack, with the drawing history and decisions together in one place.

FINAL FILES RELEASE AFTER CONFIRMED PAYMENT

Start your drawing
drawrelay / example workspace
RIVERSIDE FIT-OUT Released

Level 02 ventilation P03

Payment confirmed

Your drawing pack is ready.

M-201-P03.dwgFinal CAD drawing
M-201-P03.pdfFinal PDF drawing

Released files, revisions and queries. All in your workspace.

Illustrative workflow · sample drawings and data.

01 / 06

FROM YOUR MARK-UP TO YOUR NEXT REVISION

Let’s move your
drawing forward.

Open your workspace

Source CAD. A clear PDF mark-up. One place to keep it moving.

How we handle your drawing data